2.7.1 Field Work, this stage is performed on-site accomplished by our in-house fielders using the best technology available to accurately depict and identify all the components and/or obstructions for the proposed last mile pathway design from the pick-up point from the backbone and/or metro network of the client up to the termination point inside the end user patch panel, Inside plant work with some architectural skills is associated with this type of designs.
2.7.2 Construction Drawings, during this stage the field notes are reviewed and studied to define the best route available from the construction point of view, in conjunction with the field notes we need to analyzed the jurisdiction and other utility records to determine the path of least resistance including the definition of the permit jurisdiction limits, and for the approval of the Building owner and to be part of the lease agreement. Once completed it requires customer approval prior to submit to permit review and private owner/landlord execution.
2.7.3 Permit Process, we take the construction drawings to the respective government agency for approval with our internal permit team which they have long relations with the plan reviewers.
2.7.4 As-builts, produced from provided construction redlines, to depict to the jurisdiction for permit closure and for customer record keeping.
2.7.5 Special Note, Draftel + can provide all the items together or individual items separated upon request, Construction drawings is our most aggressive approach and we have the best price in the industry with the best quality in that phase of the process, we can do that phase only if the client provide us with decent field notes.