2.5.1 Field Work, this stage is performed on-site accomplished by our in-house fielders using the best technology available to accurately depict and identify all the components and/or obstructions for the proposed last mile pathway design up to the property line, as part of this stage of the design it is important to emphasis that the fielder need to identify the point of entry to each potential/target customer to position the handholes in the correct location no Inside plant work associated with this type of designs.
2.5.2 Construction Drawings, during this stage the field notes are reviewed and studied to define the best route available from the construction point of view and assigned fiber counts to each potential customer based on parameters given by the customer, in conjunction with the field notes we need to analyzed the jurisdiction requirements and other utility records to determine the path of least resistance including the definition of the permit jurisdiction limits. Once completed it requires customer approval prior to submit to permit review.
2.5.3 Permit Process, we take the construction drawings to the respective government agency for approval which in this types of design is most likely multiple permit agencies as the design is a large geographical area with our internal permit team which they have long relations with the plan reviewers.
2.5.4 As-builts, produced from provided construction redlines, to depict to the jurisdiction for permit closure and for customer record keeping.
2.5.5 Special Note, Draftel + can provide all the items together or individual items separated upon request, Construction drawings is our most aggressive approach and we have the best price in the industry with the best quality in that phase of the process, we can do that phase only if the client provide us with decent field notes.