2.3.1 Field Work, this stage is performed on-site along with the client representative and building engineer, in order to gain access to the telco/Electrical rooms and the individual residential units where the fiber need to be terminated this process is accomplished by our inhouse fielders using the best technology available to accurately depict and identify all the components and/or obstructions for the proposed pathway design.
2.3.2 Construction Drawings, during this stage the field notes are reviewed and studied to define the best route available from the construction point of view, in conjunction with the field notes we review if available the other specialties blue prints such as electrical / mechanical / plumbing to determine the path of least resistance for the proposed design. Once completed it requires customer approval prior to submit to permit review.
2.3.3 As-builts, produced from provided construction redlines, to depict to the jurisdiction for permit closure and for customer record keeping.
2.3.4 Special Note, Draftel + can provide all the items together or individual items separated upon request, Construction drawings is our most aggressive approach and we have the best price in the industry with the best quality in that phase of the process, we can do that phase only if the client provide us with decent field notes.